ru|en

Shipment of an Aerodynamic Training Tunnel Component from Voronezh to Durban, South Africa

/ 14.07.2026
ГК МС РУС / Logistics
ГК МС РУС / Logistics
ГК МС РУС / Logistics
/ 14.07.2026

Shipment of an Aerodynamic Training Tunnel Component from Voronezh to Durban, South Africa

MS RUS LOGISTICS SOLUTIONS has arranged the shipment of a component of an aerodynamic training tunnel from Voronezh, Russia, to the Port of Durban, South Africa. The oversized equipment was prepared for international transportation and dispatched to the customer in Africa.

As part of the cargo handling operation, the oversized component was transferred from a low-bed trailer onto a 40-foot flat rack (FR) container. Flat rack containers are specifically designed for transporting oversized and heavy cargo that cannot be accommodated inside a standard enclosed container, while providing secure lashing and handling during ocean transportation.

The loading and cargo securing operations were carried out in accordance with the applicable requirements for the transportation of oversized and heavy equipment. The subsequent delivery to the port of destination was arranged along the agreed international logistics route.

We’ll find a solution for you
Fill in the feedback form and we will contact you back
Loading
0%