ru|en

Gas-pistons unit 575 kW Cummins

Open
In container
Part number
1310575
Manufacturer
Cummins
Main power, kW
575
Main power, kWA
719
Part number
1310575
Manufacturer
Cummins
Main power, kW
575
Main power, kWA
719
Technical details
Leasing
Commissioning & installation supervision
Supply of spare parts and consumables
Technical details
Main features
Main power/Nominal power, kW / kWA
575 / 719
Voltage, kV
0,4 / 6,3 / 10,5
Rotation speed, rpm
1500
Power coefficient
0,8
Frequency, Hz
50
Расход газа, m³/h
172
Generator
Manufacturer
By request
Voltage, kV
0,4 / 6,3 / 10,5
Isolation degree
H
Winding pitch
2/3
Winding protection class
IP23
Engine
Manufacturer
Cummins
Model
QSK38G
Quantity and placement of cylinders
12, V-образное
Cylinder diameter, mm
159
Stroke of the piston, mm
159
Engine capacity, L
38
Oil system volume, L
145
Controller
Manufacturer
By request
Dimensions and weight
Dimensions (LxWxH), mm
3900х2100х2250
Weight, kg
9700
We will select a solution for you
Fill out the feedback form and we will call you back
Loading
0%
Get more
detailed information
/ Igor Mikhailovich Gegenia
Leasing
Leasing of power plants from Group of Companies MS RUS ENERGY SOLUTIONS

Leasing is a convenient and affordable method of financing, which is becoming increasingly in demand among energy companies that do not have the necessary funds to purchase equipment immediately, but want to quickly modernize production or upgrade fixed assets. Leasing programs of Group of Companies MS RUS ENERGY SOLUTIONS allow the use of energy equipment immediately after the contract is signed, dividing the payment into convenient partial installments. This approach not only reduces the burden on the company's budget but also gives the right to subsequent purchase of equipment, which distinguishes leasing from leasing. This tool is suitable for both starting new projects and upgrading existing facilities, providing flexibility, accessibility and significant tax advantages. The minimum lease term is 6 months.

Why choose energy equipment leasing?
  • Minimum requirements for documents and efficiency: the transaction processing process is as simplified as possible and does not require a large package of documents.
  • Getting started without waiting for payback: the equipment starts working immediately, making a profit from the first days of operation.
  • Individual payment schedule: the payment schedule is tailored to the specifics of the business, which facilitates budget planning.
  • There are fewer risks and costs: less collateral is required to obtain equipment for leasing than for lending.
  • Tax benefits: lease payments reduce the tax base, which reduces tax liabilities.
  • Simple equipment upgrade: at the end of the lease period, the company can either purchase the equipment or replace it with a more modern one.
The leasing registration process consists of several stages:
  • Application and preliminary consultation: the client provides the basic information and documents required to evaluate the application.
  • Equipment selection: together with the company's expert, the equipment that meets the technical and business requirements is selected.
  • Preparation of documents: constituent and financial documents are being prepared for further consideration.
  • Application analysis: The credit committee reviews the proposal and decides on financing.
  • Conclusion of the contract and making an advance payment: after the transaction is approved, the client signs the contract and pays the initial payment.
  • Equipment transfer: The equipment is put into operation by the customer.
We will find a solution for you
Fill out the feedback form and we will call you back
Загрузка
0%
Get more
detailed information
/Igor Mikhailovich Gegenya
Commissioning & installation supervision
Installation and commissioning supervision for DG and GPI

Installation supervision and commissioning are the key stages of commissioning diesel generator and gas piston installations. They ensure uninterrupted and efficient operation of the equipment, ensuring its compliance with all technical and operational requirements.

Installation supervision from GC MS RUS ENERGY SOLUTIONS

The service engineers of Group of Companies MS RUS ENERGY SOLUTIONS provide a full cycle of work on the installation of power equipment and auxiliary systems, including:

  • Energy supply: connection of equipment to electrical networks.
  • Control and alarm circuits: set up automation for reliable and safe operation.
  • Cooling and smoke extraction: installation of heat exchange and exhaust gas removal systems.
  • Air and fuel supply: installation of communications for fuel and air supply.
  • Engine maintenance: organization of oil supply and timely oil change.

Each stage of the installation work is accompanied by supervision and professional advice from technical specialists of Group of Companies MS RUS ENERGY SOLUTIONS.

Commissioning works from Group of Companies MS RUS ENERGY SOLUTIONS

Commissioning works is the final stage of preparing the equipment for operation. Group of Companies MS RUS ENERGY SOLUTIONS specialists check each system, perform load tests and provide detailed reports to the customer.

Stages of commissioning work
  • Installation verification: analysis of equipment compliance with technical documentation.
  • Connecting cables and earthing: checking the correctness and reliability of connections.
  • Control system setup: automation of work processes.
  • Test runs: tests in idle mode and under load.
  • Testing and final diagnostics: preparation of technical acts and protocols.
Our advantages
  • Professional approach: specialists from Group of Companies MS RUS ENERGY SOLUTIONS have equipment manufacturer certification and experience working with various types of DGS and GPUs.
  • Efficiency: we try to reduce work deadlines as much as possible without loss of quality.
  • Risk reduction: engineers at Group of Companies MS RUS ENERGY SOLUTIONS take into account all the nuances, preventing possible errors such as incorrect cable connection or lack of grounding.
  • Equipment testing: checking and configuring all systems before starting work, including testing at our stand.
Leave a request
Нажимая кнопку «Отправить заявку», вы даете согласие на обработку персональных данных.
Политика конфиденциальности.
Загрузка
0%
Get more
detailed information
/Igor Mikhailovich Gegenya
Supply of spare parts and consumables
Supply of spare parts and consumables for DSU and GPU

Group of Companies MS RUS ENERGY SOLUTIONS offers comprehensive services for the supply of original spare parts and consumables for any customer's request for diesel and gas piston power plants, as well as engines of leading global brands such as MTU, Cummins, Caterpillar, Jenbacher, Yuchai, Perkins and others. The original parts meet all the manufacturer's requirements, which minimizes the risk of malfunctions and reduces downtime. The spare parts are developed taking into account the specifics of each specific equipment, which guarantees their perfect compatibility and high performance, as well as helps to improve the overall efficiency of the machines and reduce the cost of their maintenance and repair.
To select the necessary components, Group of Companies MS RUS ENERGY SOLUTIONS specialists take into account the technical parameters of the equipment: engine model, serial number, current operating time and part number, which ensures that the spare parts fully comply with this equipment.

A wide range of spare parts and accessories are available in stock

Group of Companies MS RUS ENERGY SOLUTIONS has its own spare parts warehouse with in-demand items available, which allows you to quickly respond to customer requests and ensure the supply of spare parts to anywhere in Russia and the CIS countries in the shortest possible time.
Qualified advice and technical support.

The Group of Companies MS RUS ENERGY SOLUTIONS of Engineers provides support at all stages of the work:
  • assistance in the selection of spare parts,
  • site visits for diagnostics and defects,
  • recommendations on operation, repair and maintenance of equipment.
Pick up spare parts
You must specify the engine model, serial number, current operating time, and part number
Нажимая кнопку «Отправить заявку», вы даете согласие на обработку персональных данных.
Политика конфиденциальности.
Загрузка
0%
Get more information